03/07/19
A new toll section has been commissioned on M11

Starting from July 3, 2019 a new toll section 97-149 km has been commissioned on M11 highway Moscow – Saint-Petersburg

A new M11 highway site runs from Yamuga village (97 km) in Moscow region to Voskresenskoye village (149 km) in Tver region and is considered to be an alternative route to heavy M10  Russia road going through settlements and equipped with traffic lights.

The highway section was awarded the highest 1A category,  implying the division of traffic flows with the central reserve, lack of intersections, four traffic lanes – 3,75 m wide each, higher speed limit, lighting and noise barriers along the entire highway length. The site is equipped with 6 rest areas (three in each direction) and two toll plazas of closed type.

The payment is possible with cash, by card or transponder. Drivers using contactless devices connected to interoperability service can pass the section non-stop.